Engineering           

 

  • Capital and Operating Cost Requirements

  • Equipment Requirements

  • Feasibility Studies

  • Whittle Pit Optimization

  • Ultimate Pit Designs - Phased Pit Designs

  • Detailed Mine Planning

  • Mine Schedules

  • Strategic Schedules

  • Short Range, Mid Range and Long Range Mine Plans

  • Waste Dump Reclamation Planning

  • Leach Pad Development and Scheduling

  • Tailings Pond Volume Calculations

  • Stockpile Volume Calculations

  • Month End and Year End Reports

  • Ore Control